Skip to main content

Manage networks

Use MetaMask Connect EVM to detect, switch, and add EVM networks in your dapp. MetaMask Connect EVM supports wallet_switchEthereumChain for switching between networks, wallet_addEthereumChain for adding custom networks, and the chainChanged event for monitoring network changes in real time.

With MetaMask Connect EVM:

  • Detect the current network and monitor network changes.
  • Switch between networks programmatically.
  • Add new networks to MetaMask.
  • Handle common network-related errors.

MetaMask Connect EVM network switching demonstration between Ethereum networks

Detect and switch networks

With Vanilla JavaScript, implement network management directly using the eth_chainId RPC method and chainChanged provider event.

With Wagmi, use the provided hooks for several network-related operations.

Start by detecting the current network:

import { createEVMClient } from '@metamask/connect-evm'

const evmClient = await createEVMClient({
dapp: {
name: 'MetaMask Connect EVM Example',
url: window.location.href,
iconUrl: 'https://mydapp.com/icon.png', // Optional
},
api: {
supportedNetworks: {
'0x1': 'https://mainnet.infura.io/v3/YOUR_INFURA_API_KEY',
'0xaa36a7': 'https://sepolia.infura.io/v3/YOUR_INFURA_API_KEY',
},
},
})
const provider = evmClient.getProvider()

// Get current chain ID
async function getCurrentChain() {
try {
const chainId = await provider.request({
method: 'eth_chainId',
})
console.log('Current chain ID:', chainId)
return chainId
} catch (err) {
console.error('Error getting chain:', err)
}
}

// Listen for network changes
provider.on('chainChanged', chainId => {
console.log('Network changed to:', chainId)
// We recommend reloading the page
window.location.reload()
})

Switch networks using the wallet_switchEthereumChain and wallet_addEthereumChain RPC methods:

// Network configurations
const networks = {
mainnet: {
chainId: '0x1',
name: 'Ethereum Mainnet',
},
optimism: {
chainId: '0xA',
name: 'Optimism',
rpcUrls: ['https://mainnet.optimism.io'],
nativeCurrency: {
name: 'Ethereum',
symbol: 'ETH',
decimals: 18,
},
blockExplorerUrls: ['https://optimistic.etherscan.io'],
},
}

async function switchNetwork(networkKey) {
const network = networks[networkKey]

try {
// Try to switch to the network
await provider.request({
method: 'wallet_switchEthereumChain',
params: [{ chainId: network.chainId }],
})
} catch (err) {
// If the error code is 4902, the network needs to be added
if (err.code === 4902) {
try {
await provider.request({
method: 'wallet_addEthereumChain',
params: [
{
chainId: network.chainId,
chainName: network.name,
rpcUrls: network.rpcUrls,
nativeCurrency: network.nativeCurrency,
blockExplorerUrls: network.blockExplorerUrls,
},
],
})
} catch (addError) {
console.error('Error adding network:', addError)
}
} else {
console.error('Error switching network:', err)
}
}
}

Display the current network and a switch network button in HTML:

<div>
<div id="networkStatus">Current Network: Loading...</div>
<button onclick="switchNetwork('mainnet')">Switch to Mainnet</button>
<button onclick="switchNetwork('optimism')">Switch to Optimism</button>
</div>

Best practices

Follow these best practices when managing networks.

Error handling

  • Implement error handling for network switching operations.
  • Provide clear feedback messages to users when network operations fail.
  • Handle cases where networks need to be added before switching.

User experience

  • Display loading states during network switches.
  • Show clear network status information at all times.
  • Consider warning users before initiating network switches.
  • Use an RPC provider that supports your target networks.

Common errors

The following table lists common network management errors and their codes:

Error codeDescriptionSolution
4902Network not addedUse wallet_addEthereumChain to add the network first.
4001User rejected requestShow a message asking the user to approve the network switch.
-32002Request already pendingDisable the switch network button while the request is pending.

Next steps

See the following guides to add more functionality to your dapp:

Was this page helpful?